TR30 CLC Foaming Machine Concrete Foam Generator
Guotai Junan released a research report saying that under the background of carbon neutrality, the scarcity of coal mines is prominent, and the value of assets will continue to increase. The high point of capital expenditure in the coal industry appeared in 2012. Under the general direction of carbon neutrality, the overall investment in the industry has slowed down, and capital expenditure has gradually declined. From 2021 to now, the Energy Bureau of the National Development and Reform Commission has only newly approved 17.4 million tons of Concrete Foaming Generator.
Description of TR30 foam generator
Foam Concrete Machine is the core equipment of foam concrete production, which has a significant impact on the quality of foam concrete. An excellent foam generator for concrete not only has a high foam output but more importantly, the quality of the foam produced is outstanding. TR30 foam generator developed by our company. It can be used in laboratories, small-scale foam concrete cast-in-situ projects, and pilot lines of foam concrete products. The outstanding advantages of TR30 foam generator are low foam moisture content, more foaming agent, high foam uniformity, large foam output, and other benefits.
Parameters of TR30 foam generator
Model | TR30 |
Maximum foam output(m3/h) | 8 |
Motor voltage(V) | 220 |
Work rate(W) | 1500 |
Pump suction(m) | 1-3 |
Dimensions(cm) | 120*50*90 |
Weight(kg) | 120 |
Usually need to be disassembled:
1. After working for a long time, it is found that the foam shape is not good, usually more than three months.
2. Pipe blockage: Some foaming agent remaining in the bubble tube will form a solid residue. In this case, the foam cannot be produced normally, or the pipeline pressure increases sharply. At this time, all the old steel balls need to be taken out, and then replaced with a new one The ball is fine. Steel wire ball specification requirements: each blowing tube needs to be filled with about 12-15 steel wire balls. Too much or too little will affect or even destroy the foam performance.
Precautions:
1. Remember to use electricity safely. If water or foam touches the circuit, you must immediately cut off the power at the remote end to ensure safe production.
2. There will be air in the pipeline when it is used for the first time. The foaming liquid has not been pumped into the equipment in a short time. You can wait for tens of seconds until the liquid is filled with the entire suction tube and the foaming operation can be performed normally.
3. Do not start the equipment when the pipeline is blocked to prevent damage to the components due to overpressure in the pipeline.
If you are looking for foam generator please feel free to contact us and send an inquiry, email address: sales@cabr-concrete.com
Model: TR30
Maximum foam output(m3/h): 7.5
Motor voltage(V) : 220
Work rate(KW): 3
Foaming speed(L/m): 120
Bubble bleeding(kg/m3): 46
Dimensions(cm): 120*50*90
Weight(kg): 1203D printing technology emerged in the mid-1990s and is actually the latest rapid prototyping device utilizing technologies such as light curing and paper lamination. It is basically the same as ordinary printing. The printer is equipped with "printing materials" such as liquid or powder. After connecting to the computer, the "printing materials" are superimposed layer by layer through computer control, and finally the blueprint on the computer is turned into a real thing. This printing technology is called 3D stereo printing technology.
Our company is a strong company that provides excellent 3D printing Concrete Foaming Generator. If you need 3D printing and Concrete Foaming Generator, please feel free to contact us.
Inquiry us